2026-11-11 · 6 min read · Redmond
Should You Add an ADU to Boost Your Rental Income in Redmond, Oregon?
What an ADU actually is, and why it's easier to add one now
I'm Holli Cobb, a REALTOR® with REAL Broker in Redmond, and the question I hear more often from rental owners lately is whether it's worth adding a second, smaller living space onto a property they already own. An accessory dwelling unit, usually shortened to ADU, is a smaller home built on the same lot as a main house: above a garage, attached to the side, or standing alone in the backyard as its own small cottage. Oregon changed its rules a few years back to make ADUs easier to add in most cities zoned for a single-family home, which is part of why more owners are asking the question now than they were five years ago.
That doesn't mean every lot qualifies, or that adding one automatically makes financial sense. It means the option is realistically on the table in a way it wasn't before, and it's worth evaluating the same way you'd evaluate buying a second rental: on the actual numbers for your actual property, not on how the idea sounds.
What it actually costs, before you count the rent
Converting existing space, a garage, a basement, a bonus room, is almost always the cheaper path to a working ADU, because the structure, the foundation, and often the roof are already there. Building a new standalone unit in the backyard costs more because you're paying for a complete small home: foundation, framing, plumbing, electrical, and often a separate utility connection. Get a real bid from a local contractor before you assume either number, costs vary a lot depending on size, finish level, and what your lot's utilities already support, and a bid is the only number worth planning around. Permitting itself takes time too, plan on the city's review process adding weeks to months before you can break ground, not something you finalize the week before you want a tenant moving in.
Rent from the finished unit is the return side of the math, and it has to cover more than just the payment on the money you spent building it. Factor in the added property tax from the improvement, the insurance change, and ongoing maintenance on a second unit, the same way you'd underwrite buying a rental outright. An ADU that doesn't cash flow once it's actually built isn't a bargain just because you already owned the lot under it.
Will a lender count the rental income
This is the part that trips people up. If you're financing construction with a renovation loan, a HELOC, or a cash-out refinance, some lenders will count a portion of the ADU's projected rent toward what you qualify for, and some won't, it depends on the lender and the loan product, not on a rule that applies everywhere. If you're buying a property that already has a built ADU on it, an appraiser may credit some of that rental income toward the property's value, but typically only if the unit is legally permitted, not just present. An unpermitted ADU is often treated by a lender and an appraiser as if it doesn't exist at all, which is the single biggest reason to confirm permit status before you count on that income in any financing scenario.
Talk to a lender about how they'll treat the income before you commit to the project or the purchase, not after. The answer changes your actual return enough to change the decision.
Redmond's own rules are what decide this, not a general answer
Lot size, setback requirements, parking, and whether owner-occupancy is required all vary by city, and sometimes by the specific zone your lot sits in within that city. What's true in Bend or Portland isn't automatically true in Redmond, and what's true for one lot in Redmond isn't automatically true for the one next door. Before you plan around an ADU, a call to Redmond's planning department, or a look at your property's specific zoning, settles what's actually allowed on your lot, rather than planning off a general rule you read about Oregon as a whole.
If your property is on a well and septic system rather than city water and sewer, that's often the bigger constraint than zoning. A septic system sized for one household may not support a second unit without an upgrade, and that's worth checking before the zoning conversation even starts. I cover well and septic limits more broadly in what to know before you buy land in Central Oregon, the same system limits apply whether you're buying raw land or adding a unit to a lot you already own.
Is it worth it for your property
An ADU can be a genuinely good way to add rental income to a property you already own, and it can also be an expensive addition that never quite pays for itself if the lot, the permit, or the financing doesn't line up the way you hoped. The only way to know which one you're looking at is running the real numbers on your specific lot, with a real contractor bid and a real answer from a lender, before you commit to building anything. For anything about how an ADU changes your taxes or your cost basis, that conversation belongs with your CPA. For what your specific property could actually support, get in touch and we'll look at it together. If you haven't yet, what to check before you buy a rental property and cap rate vs. cash flow are worth reading alongside this one.
Frequently Asked Questions
What is an ADU?
An accessory dwelling unit: a smaller home built on the same lot as a main house, above a garage, attached to the side, or as a standalone unit in the backyard.
Do I need a special permit to add an ADU in Redmond?
Yes. Permit requirements, lot size, setbacks, and parking rules vary by city and even by zone within a city. Check with Redmond's planning department before you plan around adding one.
Will a lender count ADU rental income toward my loan?
It depends on the lender and the loan product. Some will count a portion of projected or actual rent, some won't, and an appraiser typically only credits the income if the unit is legally permitted, not just built.
Is converting an existing structure cheaper than building a new ADU?
Usually yes. Converting a garage, basement, or bonus room reuses an existing structure and foundation, which is typically less expensive than building a freestanding unit from scratch. Get a real contractor bid before assuming either number.